Case Study: River House Project

Mr Clarke replaced his gas boiler with a Kensa 24kW Single Phase Twin Compressor* to harness heat energy from a nearby lake to provide space heating and domestic hot water (DHW) to his Grade 2 listed farmhouse.

Key facts:

See the case study here.

Credits: Pond mat photos courtesy of Total Renewable Solutions
*Please note: This is a discontinued product. Take a look at Kensa’s product range here. 

 

Share Button